Message 1 of 3
Creating Schedules for Different Buildings
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
In the current Exercise I am doing, there are two buildings with matching equipment. I was asked to:
"Create two schedules (one for each building) with the equipment contained on them."
The issue is I have never seen two separate schedules with matching equipment be made for one project. I understand how to make a schedule that has the equipment from both builds on it, but not how to separate them.
Am I able to use Zones/Areas to single out what building is used?
How should I go about doing this?