Copy MEP elements from one project to new one

Copy MEP elements from one project to new one

sbienia
Participant Participant
332 Views
4 Replies
Message 1 of 5

Copy MEP elements from one project to new one

sbienia
Participant
Participant

Hello,

 

I constructed an project under the template BIM architecture and have problems now with the pipe routing.

Support told me I have to create the project under the template MEP.. 

 

how can I copy the pipes etc in the new one?

 

Thank you

0 Likes
333 Views
4 Replies
Replies (4)
Message 2 of 5

iainsavage
Mentor
Mentor

You can:

1. use transfer project standards or

2. copy pipes from one project and paste into the other - routing preferences will also be copied

 

You need to have both files open at the same time to use either method.

 

I had a template which was purely a container for different pipe types and used the above methods to transfer them into projects as required.

 

PS: you need better support - they're talking nonsense.

0 Likes
Message 3 of 5

sbienia
Participant
Participant
Ok, but how can I copy from one project to another? Can copy but not paste
0 Likes
Message 4 of 5

sbienia
Participant
Participant

Thanks can you show how?

 

I can't insert them.

0 Likes
Message 5 of 5

iainsavage
Mentor
Mentor

Have both templates/projects open at the same time.

I start with my pipetypes template:

iainsavage_0-1673445645704.png

 

Select the pipe types that you want:

iainsavage_1-1673445706553.png

Copy to clipboard (Ctrl+C or 

iainsavage_2-1673445761738.png

Switch to other project - has to be a View, NOT a sheet:

iainsavage_3-1673445892102.png

Paste and select an insertion point. Pipes are now in the second project/template:

iainsavage_4-1673446034725.png

Routing preferences are also transferred.

This method works well if you only want to transfer cetain pipe types.

 

If you want to transfer ALL of your pipes use transfer project standards.

Again have both projects/templates open.

In the second (blank) project/template go to Manage>Transfer Project Standards.

Make sure that "Copy from" is set to your other project/template (and not to a link in one of the files):

iainsavage_6-1673446647182.png

 

Best practice is to "Check none", then check the items that you want to transfer:

iainsavage_7-1673446733545.png

Then OK.

Depending on number of pipe types it might take a few minutes.

Pipe types are transferred:

iainsavage_8-1673447232933.png

 

 

 

 

0 Likes