Gotta ask this first - Why are you trying to copy them in from a linked project? I would not copy from a linked model using the copy/monitor tools, or use other copy methods such as copy and paste spaces from one project to another for these reasons:
- spaces are specific to the associated bounding elements, even when used with a linked architectural model that is set to room bounding. The space recognizes these items by element ID, so copying the space causes it to lose its relationship to the original elements.
- Spaces can be defined by entire floors at a time, making the copy monitor, or copy/paste action a little redundant. The space naming utility also handles coordinating to the room names on a project-wide basis, so the time needed to add spaces to a project is actually fairly short.
- You can use schedules to sort by space name, number or other associated properties and then select the items in the schedule. Once they are selected, you can use the properties palette to assign multiple space types (as well as other common settings, like conditioning type, operating schedule, etc. My preference would be for a user to select a series of spaces and make the change in the schedule, but right now that's not supported that I'm aware of, but I have used selected objects from a schedule and properties frequently.
- It's possible you could create a dynamo routine that search based on space name criteria, and then assign the space type. I'd have to dig around on this one to see if there's an example we could follow.
Let me know if this helps - thanks! David B.
David A. Butts
Virtual Design and Construction Manager - Kimley-Horn
Revit Certified Professional/Autodesk Certified Instructor
Revit, AutoCAD Architecture, MEP, Plant 3D, BIM Collaborate Pro Subject Matter Expert
The MEP BIM/CAD Engineer Blog