When I schedule a section of duct that is ready for fab, it reports the bottom of the insulation instead of the bottom of the duct. If I just tag the duct with elevation it comes out right. If I take the insulation off, then it reports right but I need the insulation for the hangers. Is there a way to change this in Revit?
Thanks,
Max
Solved! Go to Solution.