Revit linked models not aligned

Revit linked models not aligned

Anonymous
Not applicable
12,152 Views
4 Replies
Message 1 of 5

Revit linked models not aligned

Anonymous
Not applicable

Hi,

 

I am new to Revit, and have a question about linking model.

 

I received two models from the architect. One is the "site plan" model, another is the "building A" model. So I need to build my electrical work based on these two linked models. 

Then, the BIM plan says we should link them "origin to origin" with a specific project base point. The survey point is 0,0,0, also based on BIM.

I set up my project base point, and link these two models using "origin to origin".

Unfortunately, the "site" doesn't align with "building A".

How can I fixed it? Please help.

I checked the project based point in side the "building A". It is the same as the BIM one, while the one inside the "site" has a different "angle to the north".

 

Please Help. Thank you.

  

0 Likes
Accepted solutions (1)
12,153 Views
4 Replies
Replies (4)
Message 2 of 5

Anonymous
Not applicable
Accepted solution

@Anonymous wrote:

Hi,

 

I am new to Revit, and have a question about linking model.

 

I received two models from the architect. One is the "site plan" model, another is the "building A" model. So I need to build my electrical work based on these two linked models. 

Then, the BIM plan says we should link them "origin to origin" with a specific project base point. The survey point is 0,0,0, also based on BIM.

I set up my project base point, and link these two models using "origin to origin".

Unfortunately, the "site" doesn't align with "building A".

How can I fixed it? Please help.

I checked the project based point in side the "building A". It is the same as the BIM one, while the one inside the "site" has a different "angle to the north".

 

Please Help. Thank you.

  


You can do one of two things.

 

Option 1:

  • Open their model and link yours in
  • Move your model into proper position
  • Publish Coordinates to your model
  • Save the project

Option 2:

  • Link their model into yours
  • Move their model into position
  • Acquire coordinates from their model
Message 3 of 5

Anonymous
Not applicable

Thank you for your help.

 

I tried the second option. So I opened my file, linked their models and acquired the coordination. Then the revit told me the coordination is the same as the acquired one.

The links are still not aligned. 

 

My question:

Since these two links doesn't aligned, is this the problem from one of the links instead of my project setup?

 

0 Likes
Message 4 of 5

ToanDN
Consultant
Consultant

@Anonymous wrote:

Thank you for your help.

 

I tried the second option. So I opened my file, linked their models and acquired the coordination. Then the revit told me the coordination is the same as the acquired one.

The links are still not aligned. 

 

My question:

Since these two links doesn't aligned, is this the problem from one of the links instead of my project setup?

 


The second option involves manually aligning the linked models in your project.  Did you do that?

0 Likes
Message 5 of 5

srey.chhoeun
Contributor
Contributor

Hi ToanDN

I have exact same problem however when i either append or export to nwc all model in naviswork line up perfectly fine.

what could be causing this problem

 

thank you