I have attached the model I am working on. In this model, I have modified the top extension distance of the basement walls. However, notice that the intermediary basement wall (circled in the attached picture) does not clean-up correctly: even if both adjacent walls have the top extensions modified and equal, the problem wall still maintains the "unlocked" materials.
Question is then, how should I model this so that I get an uninterrupted "band" of basement wall with modified top extension?
PS: reason why I want to do this is following: the infrastructure has a different kind of thermal insulation than the superstructure, and the infrastructure insulation is not up to exactly Level 1, but slightly lower. I want to model this condition, so that I can then turn the insulation material (of both infrastructure and superstructure) into parts and model the pieces of insulation, so that I can then schedule and count them - leading to a more accurate shopping list.
Thanks in advance. Much appreciated.
Solved! Go to Solution.