This Seems like it should be easy to figure out but Im stumped.
If I set my site plan to true north, and the north arrow is straight up as it should be. Then I start drawing the floor plan in project north, I’m not getting the desired result and not sure how to change this.
My actual building is 14 degrees NE. But when I open the site plan, my building is parallel with North? Or facing exactly North.
what do I need to do to draw the structure in project north parallel to ortho but have it angled 14 degrees in true north?