Message 1 of 9
Toposurface cut pattern
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Is there a way to change the toposurface cut patterns? I want the fill beneath the building pad to be a gravel fill or 45 degree earth fill instead of the earth fill. Also is there a way to change the relative "height" height of a toposurface so it "rests" on an existing topo surface?
Thanks,
AAron