See photo for reference. We have a walkout basement, I have to set the toposolid at the lowest grade as it will not allow me to bring the surface down if I set it at the top grade. But now I have a line that runs through(below the garage) and the hatch changes color above it. I can't adjust either.
The thickness of the toposolid I'm using is 20' and the elevation change is only 9' so I don't understand why it won't let me push down into the toposolid if I use the top grade as the starting point. Which would remove the line all together.
What to I do to get either option to work?