Message 1 of 7
Sorting of Door & Room Schedules
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Using Revit 2019 and are working on a multi-story project and have the door schedule sorted by levels. The door schedule sorts by First Floor, then Second Floor, Third, etc. The Room Schedule is set the same, to sort by levels, but the Room Schedule sorts Fifth Floor, First Floor, Fourth Floor, Second Floor, Third Floor. Any ideas why these are not sorting the same?