Is it possible to sort the rebar schedule into which sheets the rebars are placed in?
I thought of going to each sheet and writing the sheet name into the comment parameter of all the rebars that are placed in the according sheet and then sorting the rebar schedule based on the comment parameter.
Do you guys have another solution that does not require me to manually put a comment into each of the rebars?
Thanks in advance.
Solved! Go to Solution.