I am trying to figure out how to make a sheet schedule that shows what drawings were included in the revision sets. I have the schedule made with all of the required drawings. We have multiple revisions coming and would like to indicate what drawings were included in each separate issue.
Please see the attached sample.
Thanks.
Solved! Go to Solution.