Shared Co-ordinates question
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hi All,
I'm having some problems with shared co-ordinates on a project we're involved with.
I have 3 Revit models, Ours (structural engineers), the Architect's and the MEP consultant's
As the Architect is the lead consultant we aquired co-ordinates from their model when we started ours, apparently the MEP firm did the same.
If I open the Architect model and link in our one it comes in the right place. If I link in the MEP to the Architects model it comes in the right place.
In our model if I link in the MEP model it doesn't align with ours. As a work around I can link the MEP into the Architects as an attachment and pull it through that way, but does any one know why they're not aligning if we've both aquired our coordinates from the Architectural model?
Thanks.