Message 1 of 20
Set Stepping Stone Level in Toposolid
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I have a stepping stone family with a concrete 'footing' and masonry stepper, hosted on a toposolid. The stepper is arbitrarily placed on the toposolid, so the finished level of the stepper changes as I move it around with arrow keys. I currently use 'Stepper Level' param. to get correct elevation, but need to change it if I move the stepper.
I would like to be able to set the finished elevation of the stepper relative to the floor level (i.e. AHD, not position on toposolid), such that if I move it around with arrow keys, the footing thickness grows or shrinks, keeping a consistent embedment depth. I basically need the paver hosted on the floor level, and the footing hosted on the toposolid.
Is this possible?