Hi, When I try to change the finish floor levels on my project to correspond to the topo surface I get a serious error message and I am unable to move up the elevations. Currently the garage floor level is a 0.00. The topo surface is up higher.
I need to change the garage floor level to sit at r.l. of 45.0 (approx.). Everytime I try and edit the level I get the same error message. See the screenshots attached. What could be the issue?
Solved! Go to Solution.