I was advised by a support person to put the topography into a separate file and attach it to the main file which makes it easier to work with (it's not a big project). Is this standard practice? I have started work on putting someone else's drawings in for development and their topography is mixed in with the design file so I need to advise on the file set up.
Thanks for any help.
Everything has Pros and Cons but niether are of any significance if you are working on a small project. Having a topo in a separate linked file may have more pro and advantages if you are working on a medium/large project with multiple buildings and/or multiple sites
Eventually, if in the future there is a need or a must, you can alwas split them
YOUTUBE | BIM | COMPUTATIONAL DESIGN | PARAMETRIC DESIGN | GENERATIVE DESIGN | VISUAL PROGRAMMING
If you find this reply helpful kindly hit the LIKE BUTTON and if applicable please ACCEPT AS SOLUTION
Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.