Hi all!
Hopefully, an answer will be given to a strange scenario, which involves linked six projects (A.rvt, B.rvt, C.rvt, D.rvt, E.rvt and F.rvt) into a single master file- MA.rvt. All linked projects have assemblies in them, all assemblies have also views and are ready to be scheduled- (plan view as well as side and front elevation views).
When linked to the master file- MA.rvt, none of the assemblies' views show in the project browser, making it impossible to schedule assemblies inside the master file-MA.rvt. In other words, do assemblies' views transfer over when linked into a another project?
Any solution would be greatly appreciated.
Thank you advance.
For views of the Assemblies in the Links in your Master File, try using "By Linked View".
It sounds like you are able to Schedule items from the Assemblies in Links in the Master File by checking "include elements from links" in the Schedule?