Schedule total

Schedule total

roscopeco2000
Collaborator Collaborator
991 Views
11 Replies
Message 1 of 12

Schedule total

roscopeco2000
Collaborator
Collaborator

Hello  

 

I need some help please i am working on a schedule which works total amount of glazing % per room area. I have got the first part to work so it will divide the purge ventilation area/ the room area. I need it to combine each instance into a total so the 2x windows in test and the 2 in ROSS. So test would have a % of 20% and and ROSS would be 13.4%. Eventually i would like to do this for the whole house so total glazing to total house areas.

 

Thanks hope i have been clear  

 

 

Part O.PNG

0 Likes
992 Views
11 Replies
Replies (11)
Message 2 of 12

barthbradley
Consultant
Consultant

Can't you get there by Sorting/Grouping by Room Location with Footer and Calculating the Percentage of Room Glazing?   

0 Likes
Message 3 of 12

ToanDN
Consultant
Consultant

Share your file here then we can show you how to get it done.

0 Likes
Message 4 of 12

roscopeco2000
Collaborator
Collaborator

I would appreciate your thoughts both @ToanDN  and @barthbradley , i have saved as project with PART o schedule in. @barthbradley are you saying add totals at the bottom? can these they be referenced into a parameter?

0 Likes
Message 5 of 12

barthbradley
Consultant
Consultant

Isn't this what you want?

 

Part O.png

 

Part O 2.png

0 Likes
Message 6 of 12

roscopeco2000
Collaborator
Collaborator

Hi yes it is can i use the value from the total in the footer back into a parameter?

0 Likes
Message 7 of 12

barthbradley
Consultant
Consultant

To do what exactly?  Can you elaborate with pictures?  

0 Likes
Message 8 of 12

barthbradley
Consultant
Consultant
0 Likes
Message 9 of 12

ToanDN
Consultant
Consultant

Like this?

 

ToanDN_0-1670864182751.png

 

0 Likes
Message 10 of 12

roscopeco2000
Collaborator
Collaborator

 So i want to get this total in pink circle back into the schedule, the below text i have found on another forum i think is what i am after. I just need to get my head round

Capture.PNG

 

Good, as this schedule trick is dependent on the sorting levels (calculated values have access to the sorting level totals), and you are working within the same sorting level. I think you can do this with (2) additional CVs.

Parameters you already have (I'm renaming them here):
roomArea (area of room), roomAreaLimit (10% of roomArea), windowArea (area of each window unit), roomOK (y/n)

Parameters you need:
windowAreaPercentage: calculated value Of windowArea By Room:Name (this is one of your sorting levels). This is each window's percentage of the total window area for that room.
windowAreaPercentageTotal: formula, Type: Area, windowArea / windowAreaPercent. This is the total window area for the room.

Now you need to adjust your roomOK formula to: not(windowAreaPercentageTotal > roomAreaLimit)

 

 

0 Likes
Message 11 of 12

ToanDN
Consultant
Consultant

@roscopeco2000 wrote:

 So i want to get this total in pink circle back into the schedule, the below text i have found on another forum i think is what i am after. I just need to get my head round

Capture.PNG

 

 

 

 


The total circled in pink IS in the schedule so I don't understand your question.  Where do you want to show it exactly?

0 Likes
Message 12 of 12

roscopeco2000
Collaborator
Collaborator

I don't count that as in the schedule, its a total as a footer to me. I want the total as a cell in the schedule. I need it display as cell so i can reference in a conditional format .

 

Capture.PNG

0 Likes