Rv2017 electrical panel schedule

Rv2017 electrical panel schedule

yes_and_no
Collaborator Collaborator
590 Views
3 Replies
Message 1 of 4

Rv2017 electrical panel schedule

yes_and_no
Collaborator
Collaborator

Guys, I m in Rv17, trying to create simple electrical panel schedule without using electrical template and architectural link.

On architectural Rv file, it seems something prevents me to generate the schedule, but it does fine in the electrical template file.

I screenshot the same panel, and see some differences. Perhaps someone here can help point out what to do to make it work in architecture file. Thx.

hnA__20220628_100514.jpg

hnA__20220628_100514.jpg

hnA__20220628_095801.jpg

0 Likes
Accepted solutions (1)
591 Views
3 Replies
Replies (3)
Message 2 of 4

barthbradley
Consultant
Consultant

@yes_and_no wrote:

it seems something prevents me to generate the schedule


 

 

Help | Panel Schedules | Autodesk

0 Likes
Message 3 of 4

ToanDN
Consultant
Consultant
Accepted solution

Transfer project standards from the electrical template.

0 Likes
Message 4 of 4

yes_and_no
Collaborator
Collaborator
Thanks so much for this tip.
One more question: how do I reassign a group of outlets to the same panel ?
Given that we usually assign the whole floor-outlets to the panel, then
later on as we want to break them into smaller groups (with more logical
wirings), we have to delete and recreate the outlets again in order to
assign them to the same panel. The option is no longer available if the
outlets have already been assigned. Thanks
0 Likes