Hello,

 

I am wondering if there is a way to highlight every other row with a grey hatch to make reading the schedule easier. I kind of cheated by drawing a filled region behind a schedule on the sheet (see attached), but, it doesn't update when the schedule is changed, so I have to manually change the filled region every time there is a design change.

 

Is there an easier way to do this in customizing a schedule? If not, is there a way to pass a note on to the developer? I feel this would be an extremely useful feature.

Accepted solutions (1)
1,144 Views
1 Reply
Reply (1)
Message 2 of 2

ryan.duell
Autodesk
Autodesk
Accepted solution

Hello,

 

It is currently not possible to do this in the schedule data section (only the title section you can add fill manually).  This is a documented request with the team that owns the schedule feature – I can pass along your additional feedback as well.

 

Thank you,