Hi,
Want to manage the Revision history of all drawings using the Revit's Revision/Issues Tool. Facing some difficulty-Much appreciated if a Revit expert can help resolve this query.
Through the construction phase of the project, there will be many times when NOT ALL drawings will be in the same revision. Assume that this is quite common. That being said, I am trying to understand how the Revision date can be entered only at one place & that too against a Revision ONLY?
Let me try to explain with an example scenario - Let's say we have 10 drawings issued during Jan. 2015, as Rev.A for the first time (Sheets 01-10)
Later on, only Sheets 05 &06 had to be issued as Rev. B, say, during March 2015.
Down the line, when Sheets, say 02 & 07 need to be revised; they should be only Rev.B (as this is the 1st time these drawings are being revised) & have to be issued say in June 2015.
Becuase Rev.B is a stage/sequence as per Revit, it can have only ONE date & that appears to be a roadblock!
Has anyone been able to use the Revision Tool & still be able to achieve the scenario explained above?
Thanks in advance,
R. Chandrasekar.
Solved! Go to Solution.