REFERNCE LINE PROBLEM

REFERNCE LINE PROBLEM

Anonymous
Not applicable
277 Views
2 Replies
Message 1 of 3

REFERNCE LINE PROBLEM

Anonymous
Not applicable

See attached JPEG showing linework being drawn in wrong place. Reference plane is set correctly and it is my understanding that reference plan should force linework to be in the correct place, but apparently I have some wierd thigh going on. Any ideas?

 

Thanks,

Jeff

0 Likes
278 Views
2 Replies
Replies (2)
Message 2 of 3

Anonymous
Not applicable

I did it again and now it is working. I tried it 3 time before with the result that I had posted before so I guess it will just be a mystery.

 

Jeff

0 Likes
Message 3 of 3

Anonymous
Not applicable

Now I went to do a baluster sweep and again it is shift off the reference line. Is it even possible to draw a line in in place component off the reference line because I didnt think it was possible.

 

see second attached jpeg

 

Thanks,

Jeff

0 Likes