RAIL & BALUSTER REFERENCE LEVEL NOT SAME AS RAIL REFERENCE LEVEL IN PROJECT

RAIL & BALUSTER REFERENCE LEVEL NOT SAME AS RAIL REFERENCE LEVEL IN PROJECT

Ajay_J_S
Advocate Advocate
1,696 Views
11 Replies
Message 1 of 12

RAIL & BALUSTER REFERENCE LEVEL NOT SAME AS RAIL REFERENCE LEVEL IN PROJECT

Ajay_J_S
Advocate
Advocate

HI I CREATED A SPHERE BALUSTER FAMLY AS SHOWN IN THE IMAGE AND ADDED IT TO PROJECT WITH RAILING.

ajay_jsJUMPC_0-1685608133996.png

ajay_jsJUMPC_1-1685608170860.png

THE PROBLEM I AM FACING IS THE RAIL CENTER NOT SAME AS BALUSTER CENTER AS SHOWN BELOW

ajay_jsJUMPC_2-1685608252259.png

I TRIED WITH CUSTOM PROFILE AS WELL AS THE REVIT DEFAULT PROFILES

ajay_jsJUMPC_3-1685608307650.png

 

ajay_jsJUMPC_4-1685608373124.png

APPRECIATE IF SOMEONE HELPS REAGRDING THIS ISSUE

 

 

0 Likes
1,697 Views
11 Replies
Replies (11)
Message 2 of 12

kostask_oionei
Advocate
Advocate

Hi,

What is the horizontal element? Top Rail, hand rail or rail? Does it have an offset?

Do you share a screenshot for that?


If my post help you, please give a like.
If your question was answered please mark it with ACCEPT SOLUTION. This helps others to find answers...


Kostas Kouris
Architect Engineer, M.Sc., ACI, ACP

0 Likes
Message 3 of 12

Ajay_J_S
Advocate
Advocate

HORIZONTAL ELEMENT IS THE INTERMEDIATE RAIL. BALUSTER SPHERE IS ON THE RAIL 1 STRUCTURE 

0 Likes
Message 4 of 12

kostask_oionei
Advocate
Advocate

Does the intermediate Rail have an offset?


If my post help you, please give a like.
If your question was answered please mark it with ACCEPT SOLUTION. This helps others to find answers...


Kostas Kouris
Architect Engineer, M.Sc., ACI, ACP

0 Likes
Message 5 of 12

Ajay_J_S
Advocate
Advocate

hi this is the rail edit options & height

ajay_jsJUMPC_0-1685695853332.png

This is the baluster placement options. Both rail origin & baluster origin not matching the same place

Please help

0 Likes
Message 6 of 12

kostask_oionei
Advocate
Advocate

Hi,

Check the Baluster Offset in Railing type.

 

2023-06-02_14-48-10.jpg


If my post help you, please give a like.
If your question was answered please mark it with ACCEPT SOLUTION. This helps others to find answers...


Kostas Kouris
Architect Engineer, M.Sc., ACI, ACP

0 Likes
Message 7 of 12

Mike.FORM
Advisor
Advisor

Also, double check that the profile you are using for the rails "Circular Handrail1" is sketched with the centermark at the origin intersection in the profile family.

0 Likes
Message 8 of 12

Ajay_J_S
Advocate
Advocate

hi thanks for the reply I checked the edit type property. There is no offset value provided

ajay_jsJUMPC_0-1685945640211.png

 

0 Likes
Message 9 of 12

Ajay_J_S
Advocate
Advocate

hi i am placing the image of baluster i created & the rail here.

The image here is the baluster globe i created & also checked with revit's default baluster

ajay_jsJUMPC_0-1685945769587.pngajay_jsJUMPC_1-1685945786530.png

The image below is the rail

ajay_jsJUMPC_2-1685945927225.png

 

In the project it looks like this

ajay_jsJUMPC_3-1685945973628.png

 

0 Likes
Message 10 of 12

Ajay_J_S
Advocate
Advocate

No proper solution found yet

0 Likes
Message 11 of 12

kostask_oionei
Advocate
Advocate

Hi,

I didn't understand your problem correctly. I thought you were referring to some displacement in plan view.
From what I understand, however, you are referring to an elevation or a section.
Revit places the Ref. Level of the baluster at the top of the rail.

In the baluster family you can place a Reference Plane bellow the Ref. Level controlling the offset with a type parameter. Design the sphere with Work Plane the Reference Plane.

 

2023-06-07_14-33-32.jpg

 

You can control the baluster height from this parameter.

 

2023-06-07_14-35-17.jpg

 


If my post help you, please give a like.
If your question was answered please mark it with ACCEPT SOLUTION. This helps others to find answers...


Kostas Kouris
Architect Engineer, M.Sc., ACI, ACP

0 Likes
Message 12 of 12

Ajay_J_S
Advocate
Advocate
Hi thanks for figuring this out. Usually for any families we create the ref level of the family coincides and merge with the level of the project. When we load nested families component, the reference level & origin will merge or coincide with the other family. But this baluster doesn't seem to work that way. revits precision & accuracy is very low compared to other software. I would be difficult to create ref plance & offset to control the aligning based on the size & shape of baluster & rail family something going to top of rail without any means of eagerness is bad... Still need a solution without the ref plane & offset parameter

Anywat thanks for your valuable reply