I want to extend the pulldown menu with an item in a schedule under the column Description .
There are now three items in the pull down menu.
Can someone explain to me how I can add a component in the pulldown menu?
Thanks
Gelöst! Gehe zur Lösung
Gelöst von jostroopers. Gehe zur Lösung
Gelöst von FGPerraudin. Gehe zur Lösung
Just type a new value in, and it will add it to the dropdown!
(the dropdown in that case just lists all the already used values...)
François
Francois-Gabriel Perraudin
BIM management and coaching
Hi Francois
When i do that it overwrites the value.
The new value will be added and the other value disapears.
I get the message: this change will be applied to all elements of type...
Yes, it shows only the values that exist in the project.
If you replace a unique value, it will disappear
Francois-Gabriel Perraudin
BIM management and coaching
You get this message becaus you have unticked the "itemize every instance" in the Sorting/grouping tab of your schedule settings.
So it applies the change to all the the grouped elements.
François
Francois-Gabriel Perraudin
BIM management and coaching
I found it, it was placed under the wrong catergory.
Thanks.
You can get that message either because you aren't itemizing every instance, OR because you're changing a Type Parameter.
Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.