With this change I'm currently battling changing a method I had. Like others I had a process that worked. If students hadn't chosen site yet, they would start modelling the sample building we have. Then to show them the procedure of moving their project vertically, originally built at 0.000 GFL and after placing their topo at the correct topo, (say site 10.500 L west to 10.000 R east) we would move clipped PBP up the amount it took for GFL to land nicely at the height it would in the topo. (say 10250) Naturally topo moved up above that the same amount with the relocate, so we then selected topo only and moved that down by the same amount. Maybe adjustments for what level heads and contour read. Job done. Contour labels, topo edit all easy and using correct numbers. That method doesn't work anymore.
Now I can follow @SteveKStafford method mentioned in this thread and use relocate project upwards in an elev view. Up goes building, the topo above it and int origin, pbp as well, leaving survey point down. Then I drop the topo down the same amount. 10.250. Now building and topo bang on. And change level heads to elevation base=survey point to read the correct datum heights. (default was pbp I think, which is now up high with the int. origin.).
I can even change the contour labels to read correctly changing from project base reference to survey point reference.
BUT go to edit the topography and all I have are points of what is effectively absolute to Int origin.. So height adjustments can't be inputted as topo datum heights, rather more difference from int origin. (Which makes me think,Would it be handy to have the option of absolute heights to be from survey or int origin?)
Is this procedure I am doing incorrect? All seems to work except placing or adjusting topo points are not indicative of the absolute elevation anymore.
As a matter of interest too, the contour labels don't seem to obey project base height as a reference. I can move pbp down in elevation, then select the contour labels and change their elevation base to pbp, and it remains showing the same as internal origin indication..
My normal approach is indicate to students that creation of topo is best first, and then levels height adjustments made to fit with the topo. Normal creation of proposed topo naturally follows. All good. And the building is built. But sometimes, we find ourselves with a sample building to build, with site yet unchosen. So we build at 0.000 initially. I'm just trying to find the simplest method to raise the building and levels et al up to a different height without running into ramifications, like new point placements in topo not being inputted as the real height.
Sorry, it's a bit difficult to explain, but I think I got there. 🤔
cheers