Planting Schedule that only shows plants in one building phase

Planting Schedule that only shows plants in one building phase

Sahay_R
Mentor Mentor
1,049 Views
8 Replies
Message 1 of 9

Planting Schedule that only shows plants in one building phase

Sahay_R
Mentor
Mentor

A team mate has created a planting family that is sorted by phases. Now she would like to split it up - have one schedule to show Phase 1 plantation and another for Phase 2. My thought is to create a Master, make duplicates, display only the phases we need to see. Unfortunately, it is not possible to Hide rows in a schedule, and when rows are deleted, then they take the Instances along with them. How would this be made to happen?


Rina Sahay
Autodesk Expert Elite
Revit Architecture Certified Professional

If you find my post interesting, feel free to give a Kudo.
If it solves your problem, please click Accept to enhance the Forum.
0 Likes
Accepted solutions (3)
1,050 Views
8 Replies
Replies (8)
Message 2 of 9

ToanDN
Consultant
Consultant

How did she create a planting family sorted by phase?

0 Likes
Message 3 of 9

Sahay_R
Mentor
Mentor

I meant planting schedule. It shows her plants beautifully sorted by phases. Now the trick is to split it up into separate schedules which show one phase each.

 

I am thinking of setting the Phase Filter in schedule properties for each Planting schedule.


Rina Sahay
Autodesk Expert Elite
Revit Architecture Certified Professional

If you find my post interesting, feel free to give a Kudo.
If it solves your problem, please click Accept to enhance the Forum.
0 Likes
Message 4 of 9

ToanDN
Consultant
Consultant
Accepted solution

Phase Filter = New

 

Capture.PNG

0 Likes
Message 5 of 9

Sahay_R
Mentor
Mentor
Accepted solution

.....actually, she needed to set both Phase and Phase Filter.

 

All is well!


Rina Sahay
Autodesk Expert Elite
Revit Architecture Certified Professional

If you find my post interesting, feel free to give a Kudo.
If it solves your problem, please click Accept to enhance the Forum.
0 Likes
Message 6 of 9

ToanDN
Consultant
Consultant
I typed "Phase = the phase you want to report" but I deleted it because it is too obvious.
0 Likes
Message 7 of 9

Sahay_R
Mentor
Mentor

Smiley Happy

 

But when the resulting schedule is dragged onto a sheet - next to the schedule we see a magical floating header. Basically, the schedule wants to force us to put in a second column. For the time being, I have gotten her to drag it either off the sheet or onto the headings that she wants to keep. How can we get rid of that?


Rina Sahay
Autodesk Expert Elite
Revit Architecture Certified Professional

If you find my post interesting, feel free to give a Kudo.
If it solves your problem, please click Accept to enhance the Forum.
0 Likes
Message 8 of 9

ToanDN
Consultant
Consultant
Accepted solution

Drag the second column (or in your case, only a header) and place it on top of the first column.  They will merge.

0 Likes
Message 9 of 9

Sahay_R
Mentor
Mentor

Oh, so I was right! Awesome!


Rina Sahay
Autodesk Expert Elite
Revit Architecture Certified Professional

If you find my post interesting, feel free to give a Kudo.
If it solves your problem, please click Accept to enhance the Forum.
0 Likes