Phasing

ruiterCV8G6
Enthusiast
Enthusiast

Hello guys,

 

I am currently working on our latest home for our development plan.  

This home comes with 3 options for extension in which the buyer can choose from. 

The timber framing of this house I developed in Revit with assemblies and is now almost ready for production (own facility). 

 

In the attachment I have made a schedule of the phasing and demo of the house with the possible extensions. I think that his would work perfect. 

 

However.... Do I need to set the phasing of all the assembly views seperately or is there a way to set the phasing for the compelete project in just 1 go?

 

Please share with me your thoughts on this.....Would be appreciated.

0 Likes
351 Views
3 Replies
Replies (3)
Message 2 of 4

ralphdenhaan
Collaborator
Collaborator

Hi,

 

Have you considered utilizing Design Options instead? Your attached file shows a fine example using this feature.

Select Accept as Solution and Likes are always welcome. 


Ralph den Haan, (Lazy) BIM Specialist


LinkedIn | LazyBIM Blog


 

0 Likes
Message 3 of 4

ralphdenhaan
Collaborator
Collaborator

O nevermind seeing you work with assemblies, that doesnt work with Design options.

Select Accept as Solution and Likes are always welcome. 


Ralph den Haan, (Lazy) BIM Specialist


LinkedIn | LazyBIM Blog


 

0 Likes
Message 4 of 4

ruiterCV8G6
Enthusiast
Enthusiast

Hahaha thanks Ralph. I just got excited about the design options... :-).

 

Still... the question is... can I set the phasing for every view in the whole project by just 1 click?

 

 

The other option for me is to just delete the options that the client doesn't want....