Hi everyone!
I have a Structural Revit Project, and I've linked an Architectural Revit Project.
I tried linking based on Project Base Point, Shared Coordinates and Internal Origin.
Project Base Point = Model links nicely
Shared Coordinates = Model links nicely
Internal Origin = The architectural model offsets upwards by 150mm.
I thought Internal Origin cannot be moved.
I thought its the Project Base Point, Shared Coordinates that changes itself relative to the Internal Origin.
What did I do wrong here?