Hi all,
What kind of solution do you advice for the following:
On sheets show a note under floorplans, in a format of: <Total m² of the floor> / <Total m² of all of the floors>
See the picture below for an example.
This note is supposed to be placed on multiple drawings of the same floorplan, so it should be able to update utomatically (or close to automatically), when the areas change.
I tried to tackle this through a Room Schedule, but got stuck on how to mark the "/ <Total m² of all of the floors>". Creating a formula of calculated totals is not possible to my understanding - and making a field start with "/" isn't possible anyway. Global parameter would be semi-automatic, but it cannot be scheduled.
Solved! Go to Solution.