Are there any circumstances where one would want to have the Building file be a central model and link a Site file with topo/survey into that model?

Revit is amazing
0 Likes
Accepted solutions (2)
1,293 Views
10 Replies
Replies (10)
Message 2 of 11

barthbradley
Consultant
Consultant

Bidirectional Linking? Sure. Why not? 

Message 3 of 11

ToanDN
Consultant
Consultant

Sure. 

It is not the physical dimensions of the model that dictate if it is the working model or the linked model, but the scope of work involves that model. 

 

You work in the Site model for site grading, landscape design scope.  You can link the building model in the site model for reference and coordination.  

 

You work in the Building model for building scope, even the Building is a dog house on the site.  Link the Site model in the building model similar to above.

 

With shared coordinates, they (multiple buildings on the site and the site itself) can all linked together seamlessly.

Message 4 of 11

cbt990
Collaborator
Collaborator

What if you have to change the relationship between building and ground? slab breaks, change in FF from civil, etc. Would you move the linked site model relative to the building? It seems more difficult than adjusting the relative position of the Building link relative to the site

Revit is amazing
0 Likes
Message 5 of 11

barthbradley
Consultant
Consultant

Then you move it.  

 

Maybe I'm not understanding what you are asking.  

0 Likes
Message 6 of 11

barthbradley
Consultant
Consultant

@cbt990 wrote:

change in FF from civil

 

 

Civil doesn't dictate "finished floor" height.  Civil dictates site pad elevation.   

0 Likes
Message 7 of 11

ToanDN
Consultant
Consultant
Accepted solution

@cbt990 wrote:

What if you have to change the relationship between building and ground? slab breaks, change in FF from civil, etc. Would you move the linked site model relative to the building? It seems more difficult than adjusting the relative position of the Building link relative to the site


Move the Site link up or down in the building model and acquire coordinates.

0 Likes
Message 8 of 11

barthbradley
Consultant
Consultant

In my neck of the woods, FF=0'-0" regardless of the real-world elevation of the pad.  

0 Likes
Message 9 of 11

cbt990
Collaborator
Collaborator

So building model (host) acquires initial coordinates from linked site model. then site gets adjusted in most model. acquire coordinates again of linked model to update host?

Revit is amazing
0 Likes
Message 10 of 11

barthbradley
Consultant
Consultant
Accepted solution

If the Link is shared, then when you move it, say "Yes" to the prompts.  

0 Likes
Message 11 of 11

cbt990
Collaborator
Collaborator
Meaning you measure elevations of Levels relative to FF rather than Sea Level? Crazy concept!