Hi everyone,
I need some advice on a project setup in Revit. We have two projects with a significant portion of the building that repeats in both. To manage this, we’re considering creating the repeating part as a separate file and linking it into both main project files.
This approach is new to our office, and despite some research, I still have a few questions about the best way to proceed.
For one project, should I:
- Create two files: one for the repeating building part and another main file for the rest of the building, including all annotations, grids, etc.
- Alternatively, should I create a third file specifically for annotations, grids, sheets, etc., and link both building parts into this third file?
Which setup would make it easier to manage wall, floor, and roof specifications?
I’d appreciate any insights or suggestions from those who have experience with splitting buildings into separate links.