What is the best way to work with multiple models all linked into each other? For one building, we typically have separate models for architecture, structure, and maybe MEP if the scope is large enough. The problem is that one person might need to have all models open at the same time to make changes (we are a small firm so each of us can end working in multiple disciplines when needed). With 2 models linked together and set to overlay in both, there isn't a problem. As soon as the 3rd model is added/linked, opening all 3 gives an error about having a Revit link open in more than 1 model.
Instead of each model having 2 overlay model links, should one be set to attachment? Should they all be attached? Knowing that most jobs only have an architecture and structure model, how would you incorporate the MEP model?
P.S. we keep the disciplines as separate models so we can use linked views as underlays