Message 1 of 7
Linking a callout to a view that is already created

Not applicable
01-07-2016
06:19 PM
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I created an enlarged floor plan view by duplicating a view and changing the scale. I then proceded to place elevation tags, etc from that enlarged view. I now am realizing that I need to place callouts on the parent view, but do not want it to actually create a new view for me, but rather link to the view I created my duplicating. Is there a way to create a callout bubble on the parent view and link it to the enlarged floor plan view that I have already created? That way I do not have to lose the elevations and keynotes that I have spent time sizing and placing.
I am very new to Revit, and any help would be greatly appreciated.
Thanks!