Hi friends
On a hilly site, few buildings are placed on a different levels. Some are up and some are down. Normally, there is only one set of levels with one reference point ( either project point or survey point ) which could be assigned to the Revit model, which is applicable to all buildings in the model. This is good for flat sites; but on hilly site it will create levels with odd figures for different buildings. It makes it little complicated.
In order to keep it simple, is it possible to assign different sets of levels to different buildings in a project on hilly site, with each set of levels starting with zero with respect to immediate earth level of that particular building ?
What is the trade practice to assign levels on a hilly site ?
Deepak Gupta
Architect
(...... those, who are answering the problems in community forum here, are great people .....)
Solved! Go to Solution.