- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I want to know if it is possible to copy a view with their dependents already assigned to a scope box and with certain elements such as grids, section symbols and other stuff that I have manually adjusted for each dependent view, the reason I want to do this is because I'm gonna use the same crop regions to generate different kinds of keyplans for referencing detailing such as carpentry, glazing , etc, etc, so I want to have the same croped views multiple times and be able to edit all of them within a single leading view for each discipline (that's why I want to keep them as dependents) If they lost the dependency I will have to adjust each one without they been linked with the detailing.
I hope I've made myself clear, as english is not my first language I struggled on how to describe my problem accurately.
Solved! Go to Solution.