In a family how can I attach clearance zone to level and allow to stretch with project Elevation from Level or Offset from Host.

In a family how can I attach clearance zone to level and allow to stretch with project Elevation from Level or Offset from Host.

sdonahay
Enthusiast Enthusiast
2,488 Views
20 Replies
Message 1 of 21

In a family how can I attach clearance zone to level and allow to stretch with project Elevation from Level or Offset from Host.

sdonahay
Enthusiast
Enthusiast

Does anyone know how to, in a family, attach a clearance zone to the level and allow it to stretch with project Elevation from Level or Offset from Host.

sdonahay_0-1658759266442.png

 

0 Likes
2,489 Views
20 Replies
Replies (20)
Message 2 of 21

barthbradley
Consultant
Consultant

Is the Clearance Box Aligned and Locked to Reference Planes/Ref. Level in the Family? Doesn't look like it from your screenshot.  If you want the Clearance Box to be parametrically-sized, then you need build that intelligence into the Family just like you would anything else that is parametrically-sized.  

 

...is this what you have in mind? See attached. 

0 Likes
Message 3 of 21

sdonahay
Enthusiast
Enthusiast
Yes, trying to do that. The Clearance Zone is a nested family that can attach the Top, Btm, Front, Back, Left, and Right to planes in the main family and flex. My issue is attaching the Btm of the Clearance Zone to something that stays fixed to the Level it is placed on in the Project but allows the rest to move up with the "Offset from Host" or the "Elevation from Level" in the properties. Currently, when I change the elevation in the project the clearance zone moves up or down and the bottom of it moves too. I need it to stay fixed to the elevation.
0 Likes
Message 4 of 21

barthbradley
Consultant
Consultant

See my first post again. I added something for you.  See if that RFA works for you.  

0 Likes
Message 5 of 21

sdonahay
Enthusiast
Enthusiast

No, the bottom of the clearance zone has to be stretched to the level after placement. I want it there already and stay there when the elevation is changed. This is for the detailer so they do not have to stretch or align anything after placement in plan view. They just have to change elevation in properties and that is it.

sdonahay_0-1658761187457.png

 

0 Likes
Message 6 of 21

barthbradley
Consultant
Consultant

Your family functions like that now.  

CB1.pngCB2.png

 

Lock the Clearance Box to the Level.

 

0 Likes
Message 7 of 21

sdonahay
Enthusiast
Enthusiast
can you post the model you have working correctly? I am not able to lock the zone to the level and get it working. I would like to see what you did to achieve it.
0 Likes
Message 8 of 21

ToanDN
Consultant
Consultant

ToanDN_0-1658765330906.png

 

0 Likes
Message 9 of 21

sdonahay
Enthusiast
Enthusiast

You're locking it in the project. I don't want to have to do that. I guess my intent is not achievable.

0 Likes
Message 10 of 21

ToanDN
Consultant
Consultant

@sdonahay wrote:

You're locking it in the project. I don't want to have to do that. I guess my intent is not achievable.


Actually the clearance box sticks to the level without even locking it.  

 

 

0 Likes
Message 11 of 21

barthbradley
Consultant
Consultant

Is this what you want to be able to do?

 

CBA.pngCBB.png

0 Likes
Message 12 of 21

sdonahay
Enthusiast
Enthusiast
Change the "Elevation from Level" parameter in properties in the project. It moves the whole thing. Not what I am trying to do.
0 Likes
Message 13 of 21

sdonahay
Enthusiast
Enthusiast
No, that is not what I want to do. I want to place it in a planview. Set the elevation, in the properties, and walk away. I do not want to go to an elevation view and drag/align the bottom of the clearance zone.
0 Likes
Message 14 of 21

barthbradley
Consultant
Consultant

Oops. Forgot Plan View.  See attached.  

0 Likes
Message 15 of 21

barthbradley
Consultant
Consultant

Look at the revised one (CB-2).  If that ain't what you want, then I have no idea what you are looking for.  

0 Likes
Message 16 of 21

ToanDN
Consultant
Consultant

@sdonahay wrote:
Change the "Elevation from Level" parameter in properties in the project. It moves the whole thing. Not what I am trying to do.

Why would you change Elevation from Level?  Change Offset value which is what you define in the family.

 

ToanDN_0-1658769199348.png

 

0 Likes
Message 17 of 21

sdonahay
Enthusiast
Enthusiast
Unfortunately, that is still not it. You still have to go to an elevation view and drag the bottom of the clearance zone to the level below. The whole intent of my request for help is not to have to do that. Once you place the VFD in the plan view and set the elevation in properties the VFD moves up or down but the bottom of the clearance zone stays at the level it is placed on. It may just not be achievable.
0 Likes
Message 18 of 21

sdonahay
Enthusiast
Enthusiast
Yes, that offset I added works but would like it to work without it.
0 Likes
Message 19 of 21

sdonahay
Enthusiast
Enthusiast
I guess I just don't understand what the heck the Level in the family does in relation to the geometry once place in the project. I was assuming that the level line in the family stayed connected/aligned/constrained to the level in the project it was placed on and never moves. Therefore I could attach some face/edge/plane to it and it would stay put while the rest of the family geometry moves with the offset from host or from the level in the properties in the project. It must be that those two parameters move the entire family and nothing really can stay attached to it. I will file this under WHO THE #%$^ KNOWS and leave it as I have it.

thanks, everyone for giving it a shot.
0 Likes
Message 20 of 21

barthbradley
Consultant
Consultant

@sdonahay wrote:
Unfortunately, that is still not it. You still have to go to an elevation view and drag the bottom of the clearance zone to the level below. The whole intent of my request for help is not to have to do that. Once you place the VFD in the plan view and set the elevation in properties the VFD moves up or down but the bottom of the clearance zone stays at the level it is placed on. It may just not be achievable.

 

It can be done. It's a two-step process though.  You need to "anchor" the bottom of the Clearance Box in the Project.    

0 Likes