How to move Toposurface (or Levels) up or down ?

Anonymous
Not applicable

I need to move Levels up or Toposurface down on 10' (look in attachment picture) so that it still would be marked as 0' in Level 1 and 10' in Level 2 but 10' higher. I will link my House there so levels should match. I also need to be able to move House (or toposurface) up or down if needed. How ? Thank you !

0 Likes

How to move Toposurface (or Levels) up or down ?

I need to move Levels up or Toposurface down on 10' (look in attachment picture) so that it still would be marked as 0' in Level 1 and 10' in Level 2 but 10' higher. I will link my House there so levels should match. I also need to be able to move House (or toposurface) up or down if needed. How ? Thank you !

3 REPLIES 3
Message 2 of 4
ennujozlagam
in reply to: Anonymous

ennujozlagam
Mentor
Mentor
Accepted solution

you can try this and see if helps. thanks

 

https://www.youtube.com/watch?v=7l-IITOGL6Y





Remember : without the difficult times in your LIFE, you wouldn't be who you are today. Be grateful for the good and the bad. ANGER doesn't solve anything. It builds nothing, but it can destroy everything...
Please mark this response as "Accept as Solution" if it answers your question. Kudos gladly accepted.

you can try this and see if helps. thanks

 

https://www.youtube.com/watch?v=7l-IITOGL6Y





Remember : without the difficult times in your LIFE, you wouldn't be who you are today. Be grateful for the good and the bad. ANGER doesn't solve anything. It builds nothing, but it can destroy everything...
Please mark this response as "Accept as Solution" if it answers your question. Kudos gladly accepted.
Message 3 of 4
barthbradley
in reply to: Anonymous

barthbradley
Consultant
Consultant
Accepted solution

So, what is the situation now? Sounds like you have your house in one project and your Topo & Site in another, and your intention in to link the House Project  into the Topo/Site Project.   If so, you don't move any levels in the respective projects. Just Link your House into the Topo and place it directly on top of the Topo where she goes. The Topo probably has a level site pad all ready graded for it.  Place the house on that Site Plan on the Topo, and twist is around to the correct orientation on the site (True North should be at 12 o'clock).  Once positioned correctly, Publish its position (coordinates) to the House Project.  Now it's position in the Topo is Recorded and Saved with the Project.  

 

Check back in when you get this far.  

So, what is the situation now? Sounds like you have your house in one project and your Topo & Site in another, and your intention in to link the House Project  into the Topo/Site Project.   If so, you don't move any levels in the respective projects. Just Link your House into the Topo and place it directly on top of the Topo where she goes. The Topo probably has a level site pad all ready graded for it.  Place the house on that Site Plan on the Topo, and twist is around to the correct orientation on the site (True North should be at 12 o'clock).  Once positioned correctly, Publish its position (coordinates) to the House Project.  Now it's position in the Topo is Recorded and Saved with the Project.  

 

Check back in when you get this far.  

Message 4 of 4
Anonymous
in reply to: barthbradley

Anonymous
Not applicable

Thank you again ! You are so helpful ! Yes you are correct House will be linked to site TOPO plan (you have advised me that earlier so I plan to do that). IMPORTANT QUESTION: Will I be able to do changes to the House Project and will those changes be automatically saved in Site PLAN that it linked too because I have many imported families in my House Project and none in Site project ? 

My Toposurface does not have any building pad and nothing is graded. It is a mountain. My plan is to chose location vertically and rotate it to get as less excavation as possible and then trim it around to attach house base floor to the Toposurface. 

0 Likes

Thank you again ! You are so helpful ! Yes you are correct House will be linked to site TOPO plan (you have advised me that earlier so I plan to do that). IMPORTANT QUESTION: Will I be able to do changes to the House Project and will those changes be automatically saved in Site PLAN that it linked too because I have many imported families in my House Project and none in Site project ? 

My Toposurface does not have any building pad and nothing is graded. It is a mountain. My plan is to chose location vertically and rotate it to get as less excavation as possible and then trim it around to attach house base floor to the Toposurface. 