I have a project (plans, elevations and sections), rev.00 submitted in September with all sheets, then i submitted rev.01 in October with only plans (without elevations), now i need to submit another revision (rev.02) with both plans and elevations, the problem is, the elevations sheets will now take the revisions number (rev.00 and rev.02) because it hadn't been submitted with rev.01 

but i need them to take rev.01 with the date of November, how can i do this 

0 Likes
Accepted solutions (1)
379 Views
2 Replies
Replies (2)
Message 2 of 3

ToanDN
Consultant
Consultant
Accepted solution

@Mohamed_Faramawy wrote:

I have a project (plans, elevations and sections), rev.00 submitted in September with all sheets, then i submitted rev.01 in October with only plans (without elevations), now i need to submit another revision (rev.02) with both plans and elevations, the problem is, the elevations sheets will now take the revisions number (rev.00 and rev.02) because it hadn't been submitted with rev.01 

but i need them to take rev.01 with the date of November, how can i do this 


Rev.00 - Sep (all sheets)

Rev.01 - Oct (plans)

Rev.02 -Capture.PNG

Message 3 of 3

Mohamed_Faramawy
Advocate
Advocate

Thanks a lot, that solved problem .. 