Message 1 of 5
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
In the demolition plan, i have already demolished some existing walls, which showing the dash lines.
but in the existing plan, i could not change this dash lines wall into the solid line, which represents the existing wall.
Does anyone know how to figure it out?
see the screenshort below, the first one is demolition plan, and the second one is the existing plan. The demolished wall in two plan should be different. the first is dash line, the second should be solid line.
Solved! Go to Solution.