Hello guys.
I want to organize my material takeoff sheet with the columns LEVEL || KIND OF STRUCTURAL PIECE || PIECE ID. || STRUCTURAL MATERIAL || MATERIAL VOLUME.
When i tryed to do so, it works very well for the structural columns and the floors but not with the beams.
The beams appear in the sheet but there are no level associated to them.
How can i solve it?
Below there are some pictures to ilustrate the situation.
PS: The content is in Portuguese so: Viga = Beam
Capitel = Capitol
Pilar = Column
Laje = Floor
Don't know why revit doesn't associate structural framing to levels but to reference level. And reference level only shows on the structural framing material schedule (instead of multi category, as i think you done). So i think you need to schedule your elements separetedly.
Gustavo
Can't find what you're looking for? Ask the community or share your knowledge.