Thank you all for your reply, still your answers are not about the very simple poitn I am asking:
I have everything set, all copy monitored, all levels shown, I run coordination review to check for changes in levels and grids but it does not tell me if a level was stopped monitoring or not.
I just want to know if there is a simple setting in the elevation view that highlights which levels are still copy / monitored and which levels are not, just a by view, just by looking at them when i open the view without having to click them and look for the icons. (e.g. the copy / monitored levels appear in green color, the not copy monitored in red...).
If there is no way of doing so then I can accept that and carry on with my regular checks.
thanks,