Help with revision schedule

Help with revision schedule

ct_studio
Collaborator Collaborator
76 Views
0 Replies
Message 1 of 1

Help with revision schedule

ct_studio
Collaborator
Collaborator

Hello,

 

I would like the revision date field to be blank if the sheet is not included in the current (8/11/25) revision round.

Is this possible OTB without adding in custom parameters to the sheets? Or is there another way to show this that is possible OTB?

 

Thanks.

ct_studio_0-1754947534951.png

 

 

0 Likes
77 Views
0 Replies
Replies (0)