Message 1 of 3
GFA Table & Verging re-link issue
Not applicable
07-02-2020
11:35 PM
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I have an GFA breakdown and summary schedule inside each individual blocks (building block 1 to 3). I have a master file (combined 3-blocks linked together for sheet presentation). How to transfer/link the GFA breakdown & summary schedule and also the GFA verging of each individual file into the master file? Please advise. Thanks!