Hi! I have a project I am working on and need my families to auto-populate in the schedule. 

 

I have tried editing the family and its parameters so that it updates every other instance of the same family in the project but to no avail. It only fills the one equipment with the info rather than every one of the same equipment with the same information. Alongside that I need the equipment that is filled out to auto-populate into the schedule and have all the columns filled. I'm pretty new to families and scheduling so any help would be much appreciated! 

 

Thanks!!

Tags (1)
1 REPLY 1
Message 2 of 2

Well, they need to be TYPE Parameters to do what you are describing (e.g. overwrite existing parameter values in Project).  Are they?  