Message 1 of 2
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I am doing the calculation of the facade material. I had a window family here cutting the wall.
It seems the flat surface (shown in the image) cannot be included in the schedule.
Any suggestions?
Solved! Go to Solution.