Excavation material with side slopes in topography
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hello,
I have tried taking excavation earth quantity in a topography using that method " making exact same topography, phase changes and creating foundation floor and then getting quantities in Topography schedule". But that is for the Yellow area in a picture attached. What if i have slopes (60 or 45) on sides then how can i calculate these "pink" areas. I tried creating floor there and giving angle but thats not the solution as it has its own alot problems plus i cant create an angle of 60 degrees. I also tried with changing (deleting and adding points in a copied topography) but thats also not a solution for angle.
Any help regarding calculating quantities of pink mentioned areas would be appreciated. or any other method by which i can calculate the total quantity.Excavation.jpg