Is there anyway a really long schedule can be changed to fit on a sheet? I have a 5 storey block and ideally would like it to be based on floors - so that I have for example, ground floor with all the door tags, etc and then next to it 1st floor, and so on. Or should I be creating 5 separate schedules and filter them to the appropriate floor and then drag each schedule into my drawing sheet?