We are working on a 105k SF project that has 5 add/alternates; 3 of those alternates have doors which need to be included in the door schedule. This is a state project, so the base bid plus all add/alts are included in the final CD set sent to bidding. Until a bid is selected by the state, we won't actually know which add/alts have been taken.
As such, all of our doors (those in the main model & those in each of the alternates) need to be included in the door schedule. There are a couple of us in the office working on the door package, and so far the only thing we've been able to figure out is to have a base bid schedule plus one schedule for each alternate that has doors. Are we missing something or is this just the way that it has to be done?
Is there a way to schedule doors showing main model and design option doors all in one schedule or is this a limitation that Revit has not yet resolved?