My door is not showing the To Room name in the schedule. The first reaction is to adjust the room calculation point. This family has that unchecked, and I wish to keep it that way. I know what your thinking, cant show room info with RC point, that is incorrect. I have two doors attached, both with RC point unchecked, and the double door shows the To Room name. I wish to keep the RC point unchecked so I can change the To Room name to whichever two rooms I like, without flipping the door. And I'm sure someone's thinking "why would you want that", for example a laundry closet, the door swings TO the hallway, but it is a door for the laundry closet, not the hallway, because it is not a passage door. So I wish to flip the room name without flipping the door swing. I have accomplished this with other door families previously, but I can not figure out what is preventing this door from operating the same. I appreciate all help (:

0 Likes
6,659 Views
7 Replies
Replies (7)
Message 2 of 8

ToanDN
Consultant
Consultant

Can you show a floor plan with the doors and the rooms?

0 Likes
Message 3 of 8

ChrisGamble
Collaborator
Collaborator

ChrisGamble_0-1652803237618.png

ChrisGamble_1-1652803320275.png

ChrisGamble_2-1652803333547.png

 

 

 

0 Likes
Message 4 of 8

ToanDN
Consultant
Consultant

The nested panel is the culprit.  I replaced it with the nested panel of the double door and the doors can read rooms properly.

 

ToanDN_0-1652805452883.png

 

0 Likes
Message 5 of 8

ChrisGamble
Collaborator
Collaborator

Shucks, that kinda sucks because I need that panel because it has my styles in it. Ill see if I can fix the existing panel to work.

0 Likes
Message 6 of 8

ChrisGamble
Collaborator
Collaborator

Still wrestling with it, any other ideas that resolve the family without replacing the panel?

0 Likes
Message 7 of 8

ehsanJGAHY
Explorer
Explorer

Check your schedule Phasing. Should be the same as your plan Phasing. 

ehsanJGAHY_0-1748471513247.png

 

Message 8 of 8

rbuha554DV
Observer
Observer

Thank you for your comment!

This worked out like a magic for me.