Message 1 of 9
Creating a schedule that extracts and separates two layers of RVT links.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hello,
I am trying to create a master door schedule that can identify which building and which townhouse it belongs. The way our system is set up is that we have an internal unit type model that links into a building type model that links into a site model.
I can only go one RVT link deep to get the building number. Is there a way I can add a parameter into the building model to allow me to specify the townhouse type as well?